Installation
Professional Solar Installation
End-to-end system deployment by certified engineers — done right, the first time
Built to perform. Installed to last.
Every Cycloscape installation is executed by trained, certified engineers following global safety standards. From rooftop homes to industrial rooftops and ground mounts, we've delivered hundreds of systems across Nigeria.
Our installation process
Step 01
Site Assessment
Engineer visit, shadow analysis, load profiling & structural survey
Step 02
Custom Design
Engineered drawings, equipment spec & ROI projections for your approval
Step 03
Procurement
Genuine, warranted equipment sourced from certified global manufacturers
Step 04
Installation
Certified engineers on-site with full safety compliance and clean cabling
Step 05
Testing & Handover
Full system commissioning, documentation and owner training session
What's included with every installation
- Professional mounting structures — corrosion-treated roof or ground frames, engineered to local wind load standards
- Certified cable management — UV-rated DC cables, conduit, labelled termination and surge protection throughout
- Grid / generator integration — automatic transfer switch setup for seamless source switching
- Remote monitoring setup — app configuration so you can see real-time generation and consumption from your phone
- Owner training — we don't just leave. Your team is trained to operate and understand the system fully
- 10-year workmanship warranty — our installation labour is warranted for a decade. Not a year, not two. Ten.
Installation capabilities
1kW+
Minimum residential installation
500kW+
Industrial-scale capacity
48h
Typical residential install time
10 yrs
Workmanship warranty
Ready to get installed?
- Free site visit and energy audit — no obligation
- Detailed proposal with engineering drawings and ROI breakdown
- Flexible timelines to suit your project schedule
- Financing and instalment options available
- Warranty-backed installation by certified engineers